BID PROPOSAL
____________
Date: ____________
Submitted to: ____________, ____________
Project: ____________, ____________
1. Proposal
____________ (the "Bidder") proposes to furnish the labor, materials, equipment, and supervision needed to perform the work described below for ____________ (the "Client") at ____________, for the price and on the terms stated in this Bid Proposal (the "Bid").
2. Scope of Work
Materials. The Bidder will supply all materials needed for the work. Materials will be new and of good quality unless otherwise stated.
Permits. The Bidder will obtain and pay for all permits and inspections required for the work, and the cost is included in the Bid.
Cleanup. The Bidder will keep the work area reasonably clean each day and remove its debris and equipment on completion.
3. Exclusions
Any work not described in Section 2 is excluded. The Bid assumes normal site conditions and access during regular working hours. It does not include correcting concealed or unknown conditions, such as rot, hazardous materials, or code violations in existing work, which will be addressed by change order.
4. Price
The Bidder will perform the work in Section 2 for the lump sum of ____________.
5. Payment Terms
A deposit of 30% of the price is due on acceptance, and the balance is due on completion of the work. Invoices are due within 15 days after receipt. Unpaid balances accrue interest at 1.5% per month or the maximum rate allowed by law, whichever is less, and the Bidder may stop work after 10 days' written notice of nonpayment. The Bidder may have lien rights on the property under ____________ law if it is not paid.
6. Schedule
The Bidder will begin work on a mutually agreed date after acceptance. The work is expected to take ____________. The schedule will be extended for delays caused by weather, the Client, change orders, material shortages, permit or inspection delays, or other causes beyond the Bidder's control.
7. Changes
Changes to the scope must be agreed in a written change order signed by both parties that states the change in price and schedule before the changed work begins.